VDOT News - Culpeper
RELEASE: CONTACT: |
IMMEDIATE Sharon Ketcham 540-717-8376 [email protected] |
CULP 2022-031 March 17, 2022 |
RT. 640 BRIDGE TO CLOSE FOR EMERGENCY EROSION WORK
Road closed to through traffic March 28-April 8
CULPEPER — The Virginia Department of Transportation will close Route 640 (Gilbert Station Road) for an emergency job to repair erosion at the bridge over Preddy Creek in Albemarle County.
Beginning March 28, Route 640 will be closed to through traffic. Weather permitting, the road will reopen on April 9.
The existing bridge, located 1.9 miles from Route 747E (Preddy Creek Road) and 1.1 miles to Route 784 (Doctors Crossing) was originally built in 1932 and the superstructure was replaced in the 1990’s.
Motorists are advised to use posted alternate routes during the closure.
For more information about Virginia’s bridges and VDOT’s bridge inspection program, including current conditions of the state’s bridges, FAQs and video of a bridge inspection, visit VDOT’s website, http://www.virginiadot.org/info/Bridge.asp.
(END)
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.